skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: PIP-II Injector Test Warm Front End: Commissioning Update

Conference ·
OSTI ID:1452810

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test [1] at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
Contributing Organization:
PIP-II
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1452810
Report Number(s):
FERMILAB-CONF-18-017-AD; 1676747
Resource Relation:
Conference: 9th International Particle Accelerator Conference, Vancouver, BC Canada, 04/29-05/04/2018
Country of Publication:
United States
Language:
English

Similar Records

PIP-II Injector Test Warm Front End: Commissioning Update [Slides]
Technical Report · Sun Apr 29 00:00:00 EDT 2018 · OSTI ID:1452810

Status of the Warm Front End of PIP-II Injector Test
Conference · Mon May 01 00:00:00 EDT 2017 · OSTI ID:1452810

Experience with Long-Pulse Operation of the PIP2IT Warm Front End
Conference · Sun Sep 01 00:00:00 EDT 2019 · OSTI ID:1452810

Related Subjects