skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Quality quandaries: Statistical detective work to understand the isotopic ratios in Drum 68660 and the radioactive release at WIPP

Journal Article · · Quality Engineering

An incident at the Department of Energy's Waste Isolation Pilot Plant (WIPP) in 2014 resulted in the release of radioactive material into the environment. Initially, it was known that at least one drum in WIPP, identified as drum 68660, was involved. However, questions remained. Could the air-monitor isotopic ratios measured in WIPP at the time of the release be explained by materials in drum 68660 or were other drums involved? Could internal conditions in drum 68660 have caused the breach? What were the implications for 68660's sister drum? These questions needed to be answered as quickly as possible. Here, this analysis, which was completed in three weeks, combined combinatorics and uncertainty analysis to provide scientists with the timely evidence they needed to either answer these important questions or to design experiments to answer them.

Research Organization:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
Grant/Contract Number:
AC52-06NA25396
OSTI ID:
1412895
Report Number(s):
LA-UR-17-22437; TRN: US1800401
Journal Information:
Quality Engineering, Vol. 29, Issue 4; ISSN 0898-2112
Publisher:
American Society for Quality ControlCopyright Statement
Country of Publication:
United States
Language:
English

Similar Records

Simultaneous Thermal Analysis of WIPP and LANL Waste Drum Samples: A Preliminary Report
Technical Report · Mon Oct 19 00:00:00 EDT 2015 · OSTI ID:1412895

Small-Scale Experiments.10-gallon drum experiment summary
Technical Report · Thu Feb 05 00:00:00 EST 2015 · OSTI ID:1412895

Mechanical Modeling of a WIPP Drum Under Pressure
Technical Report · Tue Nov 25 00:00:00 EST 2014 · OSTI ID:1412895