skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: SIMULATED PERFORMANCE OF THE PRODUCTION TARGET FOR THE MUON G-2 EXPERIMENT

Conference ·
OSTI ID:1371764

The Muon g-2 Experiment plans to use the Fermilab Re-cycler Ring for forming the proton bunches that hit its pro-duction target. The proposed scheme uses one RF system, 80 kV of 2.5 MHz RF. In order to avoid bunch rotations in a mismatched bucket, the 2.5 MHz is ramped adiabatically from 3 to 80 kV in 90 ms. In this study, the interaction of the primary proton beam with the production target for the Muon g-2 Experiment is numerically examined.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1371764
Report Number(s):
FERMILAB-CONF-17-176-AD; 1610571
Country of Publication:
United States
Language:
English

Similar Records

Adiabatic capture and debunching
Technical Report · Thu Mar 01 00:00:00 EST 2012 · OSTI ID:1371764

Theory and simulations on g-2 proton beam preparation
Technical Report · Mon Apr 01 00:00:00 EDT 2013 · OSTI ID:1371764

LLRF System for the Fermilab Muon g-2 and Mu2e Projects
Conference · Fri Mar 23 00:00:00 EDT 2018 · OSTI ID:1371764