SIMULATED PERFORMANCE OF THE PRODUCTION TARGET FOR THE MUON G-2 EXPERIMENT
Conference
·
OSTI ID:1371764
- Fermilab
- Northern Illinois U.
- Brookhaven Natl. Lab.
The Muon g-2 Experiment plans to use the Fermilab Re-cycler Ring for forming the proton bunches that hit its pro-duction target. The proposed scheme uses one RF system, 80 kV of 2.5 MHz RF. In order to avoid bunch rotations in a mismatched bucket, the 2.5 MHz is ramped adiabatically from 3 to 80 kV in 90 ms. In this study, the interaction of the primary proton beam with the production target for the Muon g-2 Experiment is numerically examined.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1371764
- Report Number(s):
- FERMILAB-CONF-17-176-AD; 1610571
- Country of Publication:
- United States
- Language:
- English
Similar Records
Adiabatic capture and debunching
Theory and simulations on g-2 proton beam preparation
LLRF System for the Fermilab Muon g-2 and Mu2e Projects
Technical Report
·
Thu Mar 01 00:00:00 EST 2012
·
OSTI ID:1371764
Theory and simulations on g-2 proton beam preparation
Technical Report
·
Mon Apr 01 00:00:00 EDT 2013
·
OSTI ID:1371764
LLRF System for the Fermilab Muon g-2 and Mu2e Projects
Conference
·
Fri Mar 23 00:00:00 EDT 2018
·
OSTI ID:1371764