Title: Joint U.S./Russian Study on the Development of a Preliminary Cost Estimate of the SAFSTOR Decommissioning Alternative for the Leningrad Nuclear Power Plant Unit #1

Technical Report ·
DOI:https://doi.org/10.2172/1247· OSTI ID:1247

The objectives of the two joint Russian/U.S. Leningrad Nuclear Power Plant (NPP) Unit #1 studies were the development of a safe, technically feasible, economically acceptable decom missioning strategy, and the preliminary cost evaluation of the developed strategy. The first study, resulting in the decommissioning strategy, was performed in 1996 and 1997. The preliminary cost estimation study, described in this report, was performed in 1997 and 1998. The decommissioning strategy study included the analyses of three basic RBM.K decommission- ing alternatives, refined for the Leningrad NPP Unit #1. The analyses included analysis of the requirements for the planning and preparation as well as the decommissioning phases.

Research Organization:
Pacific Northwest National Laboratory, Richland, WA
Sponsoring Organization:
USDOE
DOE Contract Number:
AC06-76RL01830
OSTI ID:
1247
Report Number(s):
PNNL-12013; R&D Project: 22415; AF1530000; ON: DE00001247
Country of Publication:
United States
Language:
English