skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Milestone M3FT-15OR0203112. Build redesigned HFIR rabbit capsules and make ready for insertion for irradiation in HFIR

Technical Report ·
DOI:https://doi.org/10.2172/1221744· OSTI ID:1221744
 [1];  [1];  [2]
  1. Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
  2. Idaho National Lab. (INL), Idaho Falls, ID (United States)

This report details the fabrication and delivery of two Fuel Cycle Research and Development irradiation capsules (FCRP20 and FCRP03), with associated quality assurance documentation, to the High Flux Isotope Reactor. The capsules and documentation were delivered by September 30, 2015, thus meeting the deadline for milestone M3FT-15OR0203112. These irradiation experiments irradiate metal parallelepiped specimens that may consist of various compositions including uranium metal, steel, etc. This document contains a copy of the completed capsule fabrication request sheets, which detail all constituent components, pertinent drawings, etc., along with a detailed summary of the capsule assembly process performed by the Thermal Hydraulics and Irradiation Engineering Group (THIEG) in the Reactor and Nuclear Systems Division. A complete fabrication package record is maintained by THIEG and is available upon request.

Research Organization:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE Office of Nuclear Energy (NE)
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1221744
Report Number(s):
ORNL/SPR-2015/555; AF5810000; NEAF224
Country of Publication:
United States
Language:
English