Title: Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings

Abstract

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 2 provides the complete set of the Detail Design drawings along with a listing of the drawings. Once approved by WHC, these drawings will be issued and baselined for the Title 3 construction effort.

Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States); Raytheon Engineers and Constructors, Inc., Philadelphia, PA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
113882
Report Number(s):
WHC-SD-W113-FDR-001-Vol.2
ON: TI96000771; CNN: Contract MJJ-SVV-364162; TRN: 95:022208
DOE Contract Number:  
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Sep 1995
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; RADIOACTIVE WASTE FACILITIES; ENGINEERING DRAWINGS; STORAGE FACILITIES; WASTE RETRIEVAL; REMEDIAL ACTION; RADIOACTIVE WASTES; DESIGN; COMPILED DATA

Citation Formats

. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings. United States: N. p., 1995. Web. doi:10.2172/113882.
. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings. United States. https://doi.org/10.2172/113882
. 1995. "Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings". United States. https://doi.org/10.2172/113882. https://www.osti.gov/servlets/purl/113882.
@article{osti_113882,
title = {Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings},
author = {},
abstractNote = {The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 2 provides the complete set of the Detail Design drawings along with a listing of the drawings. Once approved by WHC, these drawings will be issued and baselined for the Title 3 construction effort.},
doi = {10.2172/113882},
url = {https://www.osti.gov/biblio/113882}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Fri Sep 01 00:00:00 EDT 1995},
month = {Fri Sep 01 00:00:00 EDT 1995}
}