Title: Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

Abstract

This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPsmore » used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

Publication Date:
Research Org.:
S.M. Stoller Corporation (United States)
Sponsoring Org.:
USDOE Office of Legacy Management
OSTI Identifier:
1132816
Report Number(s):
LMS/PRO/S-04351-14.2
TRN: US1400423
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES; standard operating procedure, SOP, LM, Environmental Procedures Catalog, field measures, ASTM

Citation Formats

. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites. United States: N. p., 2012. Web. doi:10.2172/1132816.
. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites. United States. https://doi.org/10.2172/1132816
. 2012. "Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites". United States. https://doi.org/10.2172/1132816. https://www.osti.gov/servlets/purl/1132816.
@article{osti_1132816,
title = {Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites},
author = {},
abstractNote = {This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.},
doi = {10.2172/1132816},
url = {https://www.osti.gov/biblio/1132816}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Oct 24 00:00:00 EDT 2012},
month = {Wed Oct 24 00:00:00 EDT 2012}
}