skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Geomagnetic Storms and Long-Term Impacts on Power Systems

Technical Report ·
DOI:https://doi.org/10.2172/1059627· OSTI ID:1059627

Pacific Northwest National Laboratory was commissioned to study the potential impact of a severe GIC event on the western U.S.-Canada power grid (referred to as the Western Interconnection). The study identified long transmission lines (length exceeding 150 miles) that did not include series capacitors. The basic assumption for the study is that a GIC is more likely to couple to long transmission lines, and that series capacitors would block the flow of the induced DC GIC. Power system simulations were conducted to evaluate impacts to the bulk power system if transformers on either end of these lines failed. The study results indicated that the Western Interconnection was not substantially at risk to GIC because of the relatively small number of transmission lines that met this criterion. This report also provides a summary of the Hydro-Québec blackout on March 13, 1989, which was caused by a GIC. This case study delves into the failure mechanisms of that event, lessons learned, and preventive measures that have been implemented to minimize the likelihood of its reoccurrence. Finally, the report recommends that the electric power industry consider the adoption of new protective relaying approaches that will prevent severe GIC events from catastrophically damaging transformers. The resulting changes may increase the likelihood of smaller disruptions but should prevent an unlikely yet catastrophic national-level event.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
1059627
Report Number(s):
PNNL-21033; 400904120
Country of Publication:
United States
Language:
English

Similar Records

Investigation of geomagnetically induced currents in the proposed Winnipeg-Duluth-Twin Cities 500-kV transmission line. Final report
Technical Report · Wed Jul 01 00:00:00 EDT 1981 · OSTI ID:1059627

Modeling the impact of GIC neutral blocking devices on distance protection relay operations for transmission lines
Journal Article · Mon Dec 09 00:00:00 EST 2019 · Electric Power Systems Research · OSTI ID:1059627

Geomagnetic effects modelling for the PJM interconnection system. Part 2; Geomagnetically induced current study results
Journal Article · Fri May 01 00:00:00 EDT 1992 · IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States) · OSTI ID:1059627

Related Subjects