Title: D0 Silicon Upgrade: End Calorimeter Transfer Bridge Modification

Technical Report ·
DOI:https://doi.org/10.2172/1033279· OSTI ID:1033279

During the assembly of major components into the D0 Detector, a transfer bridge was required to move the North-End Calorimeter from the clean room,over the cable bridge and onto the north sidewalk of the assembly hall. This experiment is now at the beginning stages of the next phase, namely the upgrade of this Detector for future physics research. A major piece of this upgrade is the installation of a solenoid magnet into the Central Calorimeter. In order to accomplish this, the South End Calorimeter has to be removed from the detector and the North End Calorimeter must be moved an additional 20-inch from its nominal open position (total 60-inch movement). The South End Calorimeter will be removed from the detector using the equipment designed for its installation. The calorimeter will be staged on the south sidewalk during the installation of the solenoid magnet and the central tracking systems. The North End Calorimeter is moved 60-inch to give more space between calorimeters during magnet, tracker and cable installation work. This movement will allow the calorimeter to remain coupled to the cryo system. However, this movement requires an extension be added to the center beam. This extension will support the rear wheels of the calorimeter and in the case of the end calorimeters, carry the majority of the weight. The extension is to be a modification of the transfer bridge. This modification, basically has T1 steel blocks added to one end and legs to the sidewalk supports at the other. The T1 steel blocks are notched to fit into the center beam porches and are welded to bridge rails. This design is the same as that for the installation bridge (3740.312-ME-273456), including the welds and weld procedures which are identical in both cases. Since load testing is impractical, the critical welds will be non-destructive tested by ultrasonic means. The laboratory, through the FESS Department, has a contract with M.Q.S. Inspection Inc. The results of this testing will be submitted to the panel for review before the bridge is put into use. It is noted here, that M.Q.S. did perform an ultrasonic test on the critical welds of the EC-CC installation bridge on Oct. 2, 1990. That test demonstrated the weld penetrations between the T1 and A-36 materials. Copies were given to the committee at that time. A copy of the original North End Cap Calorimeter Installation Note is attached for reference.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1033279
Report Number(s):
FERMILAB-D0-EN-452; TRN: US1200356
Country of Publication:
United States
Language:
English

Similar Records

D0 Silicon Upgrade: End Calorimeter Transfer Bridge Design and Installation Procedures
Technical Report · Mon Feb 25 00:00:00 EST 1991 · OSTI ID:1033279

Solenoidal Magnet Installation
Technical Report · Wed Jan 21 00:00:00 EST 1998 · OSTI ID:1033279

D0 Silicon Upgrade: Muon Shield Conceptual Design Report
Technical Report · Tue May 14 00:00:00 EDT 1996 · OSTI ID:1033279