Title: Stress Analysis of the D-Zero Solenoid Magnet Lifting Fixture PPD Fixture #102

Technical Report ·
DOI:https://doi.org/10.2172/1032126· OSTI ID:1032126

This engineering note presents stress analysis calculations for the below the hook lifting fixture which will be used to move the D-Zero solenoid magnet during installation work at the D-Zero Assembly building. Load bearing structural members are shown to have a minimum design factor of 3 based on yield strength as required by ASME B30.20. All bolts were analyzed and shown to be kept below allowable loads/stresses listed in the American Institute of Steel Construction (AISC) manual. The lifting fixture will be manufactured at Fermilab using some material scavenged from an existing lifting fixture that was shipped with the magnet from the magnet manufacturer, Toshiba Corporation. The fixture is designed with built in versatility so that the solenoid magnet can be maneuvered through the stages of preparation and installation into it's final mounted position. The structure has been analyzed for all phases of its use, although the analysis of the structure as a below the hook lifting device is the main purpose of this note.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1032126
Report Number(s):
FERMILAB-D0-EN-472; TRN: US1200491
Country of Publication:
United States
Language:
English