skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Inspections performed by Du Pont on the telescope actuator system: Part 4

Technical Report ·
DOI:https://doi.org/10.2172/10192392· OSTI ID:10192392

Five telescope actuator systems designated as ``R``, ``P``, ``L``, ``K`` and ``C`` were fabricated at New York Ship. All five were similar in specifications except for minor detail. For overall assembly refer to du Pont arrangement drawings W-153422, W-153423, and W-153424. These drawings illustrate ``R`` unit; however, they are representative of all units. They show a complete listing of material required and an overall view of the telescoping assembly. Since jigs and special tooling were set up to conform to a definite deck plate fabrication sequence, the inspection procedures and methods described in this book will follow logically the fabrication steps.

Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-76SR00001
OSTI ID:
10192392
Report Number(s):
SR/H-835; ON: DE95002287
Resource Relation:
Other Information: PBD: 1 Nov 1953
Country of Publication:
United States
Language:
English

Similar Records

Fabrication and testing history prototypes and production units
Technical Report · Wed Sep 01 00:00:00 EDT 1954 · OSTI ID:10192392

Building NYX [Engineering Materials]
Miscellaneous · Sat Dec 31 00:00:00 EST 1988 · OSTI ID:10192392

Building NYX [Engineering Materials]
Technical Report · Fri Jan 01 00:00:00 EST 1988 · OSTI ID:10192392