skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Data management plan for the ultrasonic inspection of the double-shell tanks

Technical Report ·
DOI:https://doi.org/10.2172/10189820· OSTI ID:10189820

To obtain an operating permit from Washington State Department of Ecology, Westinghouse Hanford Company (WHC) must assess the double-shell tanks (DST) for structural integrity. The assessment includes volumetric examinations of the primary steel tank and secondary steel liner. The integrity of the tanks will be assessed by remote ultrasonic (UT) inspections of the primary and secondary steel tanks to measure wall thickness and detect corrosion pitting and stress corrosion cracking. The surfaces of the areas to be inspected will be cleaned with a power wire brush to remove loose mill scale, rust, and other materials that could inhibit proper coupling of the UT probe. To ensure that the cleaning process is satisfactory, the cleaned area will be viewed with a video camera and recorded. The video and UT equipment will be calibrated the ensure accuracy, and a performance test will be conducted to verify its capabilities. The tank inspection sequence consists of cleaning, visual examination, and UT inspection of each region selected for inspection: the primary tank wall, the tank bottom and lower knuckle, and the secondary tank wall. A significant amount of data will be collected and reported during these examinations. This data management plan (DMP) describes the data produced by the examinations and how and where the data are to be stored.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10189820
Report Number(s):
WHC-SD-WM-DP-089; ON: DE95001542; BR: 35AF11201/35AF11202; TRN: AHC29501%%46
Resource Relation:
Other Information: PBD: 30 Sep 1994
Country of Publication:
United States
Language:
English