Piping benchmark problems for the General Electric Advanced Boiling Water Reactor
Abstract
To satisfy the need for verification of the computer programs and modeling techniques that will be used to perform the final piping analyses for an advanced boiling water reactor standard design, three benchmark problems were developed. The problems are representative piping systems subjected to representative dynamic loads with solutions developed using the methods being proposed for analysis for the advanced reactor standard design. It will be required that the combined license holders demonstrate that their solutions to these problems are in agreement with the benchmark problem set.
- Authors:
-
- Brookhaven National Lab., Upton, NY (US)
- Publication Date:
- Research Org.:
- US Nuclear Regulatory Commission (NRC), Washington, DC (United States). Div. of Engineering; Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Org.:
- Nuclear Regulatory Commission, Washington, DC (United States)
- OSTI Identifier:
- 10181166
- Report Number(s):
- NUREG/CR-6049; BNL-NUREG-52377
ON: TI93019500; TRN: 93:020036
- DOE Contract Number:
- AC02-76CH00016
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: Aug 1993
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 22 GENERAL STUDIES OF NUCLEAR REACTORS; 21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; BWR TYPE REACTORS; REACTOR SAFETY; PIPES; STRESS ANALYSIS; BENCHMARKS; DYNAMIC LOADS; COMPUTER CALCULATIONS; REACTOR LICENSING; 220900; 210100; POWER REACTORS, NONBREEDING, LIGHT-WATER MODERATED, BOILING WATER COOLED
Citation Formats
Bezler, P, DeGrassi, G, Braverman, J, and Wang, Y K. Piping benchmark problems for the General Electric Advanced Boiling Water Reactor. United States: N. p., 1993.
Web. doi:10.2172/10181166.
Bezler, P, DeGrassi, G, Braverman, J, & Wang, Y K. Piping benchmark problems for the General Electric Advanced Boiling Water Reactor. United States. https://doi.org/10.2172/10181166
Bezler, P, DeGrassi, G, Braverman, J, and Wang, Y K. 1993.
"Piping benchmark problems for the General Electric Advanced Boiling Water Reactor". United States. https://doi.org/10.2172/10181166. https://www.osti.gov/servlets/purl/10181166.
@article{osti_10181166,
title = {Piping benchmark problems for the General Electric Advanced Boiling Water Reactor},
author = {Bezler, P and DeGrassi, G and Braverman, J and Wang, Y K},
abstractNote = {To satisfy the need for verification of the computer programs and modeling techniques that will be used to perform the final piping analyses for an advanced boiling water reactor standard design, three benchmark problems were developed. The problems are representative piping systems subjected to representative dynamic loads with solutions developed using the methods being proposed for analysis for the advanced reactor standard design. It will be required that the combined license holders demonstrate that their solutions to these problems are in agreement with the benchmark problem set.},
doi = {10.2172/10181166},
url = {https://www.osti.gov/biblio/10181166},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Aug 01 00:00:00 EDT 1993},
month = {Sun Aug 01 00:00:00 EDT 1993}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.