Toms Creek Integrated Gasification Combined Cycle Demonstration Project. Final quarterly technical progress report for the period ending March 31, 1993
Abstract
This Quarterly Technical Progress Report for the period ending March 31, 1993 summarizes the work done to data by Tampella Power Corporation and Enviropower, Inc. on the integrated combined-cycle power plant project. Efforts were concentrated on the Toms Creek PDS (Preliminary Design and Studies). Tampella Power Corporation`s efforts were concentrated on the Toms Creek Preliminary Process Flow Diagram (PFD) and Piping and Instrument Diagrams (P&IDs). Tampella Power Corporation also prepared Heat and Material Balances (H&MBs) for different site-specific cases.
- Authors:
- Publication Date:
- Research Org.:
- Tampella Power Corp., Williamsport, PA (United States)
- Sponsoring Org.:
- USDOE, Washington, DC (United States)
- OSTI Identifier:
- 10177598
- Report Number(s):
- DOE/MC/29444-3403
ON: DE93019999
- DOE Contract Number:
- FC21-93MC29444
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 24 May 1993
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 20 FOSSIL-FUELED POWER PLANTS; 01 COAL, LIGNITE, AND PEAT; COMBINED-CYCLE POWER PLANTS; OPERATION; COAL GAS; HOT GAS CLEANUP; PROGRESS REPORT; COAL GASIFICATION; POLLUTION CONTROL EQUIPMENT; SOLIDS; ASHES; SORPTION; FILTERS; DOLOMITE; FUEL FEEDING SYSTEMS; 200102; 010402; 010404; 200202; POWER CYCLES; PURIFICATION AND UPGRADING; GASIFICATION; NOXIOUS GAS AND PARTICULATE EMISSIONS
Citation Formats
Feher, G. Toms Creek Integrated Gasification Combined Cycle Demonstration Project. Final quarterly technical progress report for the period ending March 31, 1993. United States: N. p., 1993.
Web. doi:10.2172/10177598.
Feher, G. Toms Creek Integrated Gasification Combined Cycle Demonstration Project. Final quarterly technical progress report for the period ending March 31, 1993. United States. https://doi.org/10.2172/10177598
Feher, G. 1993.
"Toms Creek Integrated Gasification Combined Cycle Demonstration Project. Final quarterly technical progress report for the period ending March 31, 1993". United States. https://doi.org/10.2172/10177598. https://www.osti.gov/servlets/purl/10177598.
@article{osti_10177598,
title = {Toms Creek Integrated Gasification Combined Cycle Demonstration Project. Final quarterly technical progress report for the period ending March 31, 1993},
author = {Feher, G},
abstractNote = {This Quarterly Technical Progress Report for the period ending March 31, 1993 summarizes the work done to data by Tampella Power Corporation and Enviropower, Inc. on the integrated combined-cycle power plant project. Efforts were concentrated on the Toms Creek PDS (Preliminary Design and Studies). Tampella Power Corporation`s efforts were concentrated on the Toms Creek Preliminary Process Flow Diagram (PFD) and Piping and Instrument Diagrams (P&IDs). Tampella Power Corporation also prepared Heat and Material Balances (H&MBs) for different site-specific cases.},
doi = {10.2172/10177598},
url = {https://www.osti.gov/biblio/10177598},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon May 24 00:00:00 EDT 1993},
month = {Mon May 24 00:00:00 EDT 1993}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.