skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

Technical Report ·
DOI:https://doi.org/10.2172/10142839· OSTI ID:10142839

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

Research Organization:
USDOE Bonneville Power Administration, Portland, OR (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
OSTI ID:
10142839
Report Number(s):
DOE/BP-1844; ON: DE92013557; DOE/EIS-0160
Resource Relation:
Other Information: PBD: Apr 1992; Related Information: Title page: Draft Environmental Impact Statement : Puget Sound Area Electric Reliability Plan, Appendix E, Transmission Reinforcement Analysis
Country of Publication:
United States
Language:
English