Title: N-Reactor lithium-aluminate target element process development and fabrication

Abstract

Fabrication of LiAlO{sub 2} target elements for the N-Reactor Coproduct Demonstration Program required development of a suitable fabrication process consistent with installation of a minimum production facility on a limited time schedule. The most advanced manufacturing process developed and used within the facility and schedule constraints is described in detail. Major problems encountered in obtaining required component materials and development of the fabrication process are discussed and analyzed for impact on future programs utilizing LiAlO{sub 2} target elements.

Authors:
Publication Date:
Research Org.:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
10119831
Report Number(s):
RL-GEN-1773
ON: DE92007667
DOE Contract Number:  
AC06-76RL01830
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 30 Dec 1967
Country of Publication:
United States
Language:
English
Subject:
22 GENERAL STUDIES OF NUCLEAR REACTORS; TARGETS; FABRICATION; LITHIUM CARBONATES; ALUMINATES; LITHIUM COMPOUNDS; ZIRCALOY; DEFECTS; PROCESS CONTROL; 220600; RESEARCH, TEST, TRAINING, PRODUCTION, IRRADIATION, MATERIALS TESTING REACTORS

Citation Formats

Shaw, C H. N-Reactor lithium-aluminate target element process development and fabrication. United States: N. p., 1967. Web. doi:10.2172/10119831.
Shaw, C H. N-Reactor lithium-aluminate target element process development and fabrication. United States. https://doi.org/10.2172/10119831
Shaw, C H. 1967. "N-Reactor lithium-aluminate target element process development and fabrication". United States. https://doi.org/10.2172/10119831. https://www.osti.gov/servlets/purl/10119831.
@article{osti_10119831,
title = {N-Reactor lithium-aluminate target element process development and fabrication},
author = {Shaw, C H},
abstractNote = {Fabrication of LiAlO{sub 2} target elements for the N-Reactor Coproduct Demonstration Program required development of a suitable fabrication process consistent with installation of a minimum production facility on a limited time schedule. The most advanced manufacturing process developed and used within the facility and schedule constraints is described in detail. Major problems encountered in obtaining required component materials and development of the fabrication process are discussed and analyzed for impact on future programs utilizing LiAlO{sub 2} target elements.},
doi = {10.2172/10119831},
url = {https://www.osti.gov/biblio/10119831}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sat Dec 30 00:00:00 EST 1967},
month = {Sat Dec 30 00:00:00 EST 1967}
}