Title: Interim essential and support drawing list for K Basins

Technical Report ·
DOI:https://doi.org/10.2172/10114600· OSTI ID:10114600

This document presents a list of essential and support drawings that have been identified as required to achieve the mission objectives of K Basin and are an integral part of the in-progress K Basins system baselining effort. The drawings listed in the appendix are those drawings required to safely operate K Basins. These drawings will be authenticated through the field verification and design reconstitution programs to ensure that these identified drawings are consistent with design requirements.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10114600
Report Number(s):
WHC-SD-SNF-EDL-001; ON: DE95005643; BR: 35AF11201/35AF11202; TRN: AHC29507%%37
Resource Relation:
Other Information: PBD: 16 Dec 1994
Country of Publication:
United States
Language:
English