Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information
  1. Emigration of Natural and Hatchery Chinook Salmon and Steelhead Smolts from the Imnaha River, Oregon, 1998-1999 Annual Report.

    This report summarizes the results of the Lower Snake River Compensation Plan Hatchery Evaluation Studies (LSRCP) and the Imnaha Smolt Monitoring Program (SMP) for the 1999 smolt migration from the Imnaha River, Oregon. These studies were designed and closely coordinated to provide information about juvenile natural and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus mykiss) biological characteristics, behavior and emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam on the Columbia River. Data collected from these studies are shared with the Fish Passage Center (FPC). These data are essential to quantify smolt survival rates under the current passage conditions and to evaluate the future recovery strategies that seek to optimize smolt survival through the hydroelectric system. Information shared with the FPC assists with in-season shaping of flow and spill management requests in the Snake River reservoirs. The Bonneville Power Administration and the United States Fish and Wildlife Service contracted the Nez Perce Tribe (NPT) to monitor emigration timing and tag 21,200 emigrating natural and hatchery chinook salmon and steelhead smolts from the Imnaha River during the spring emigration period (March 1-June 15) with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 1999 marked the eighth year of emigration studies on the Imnaha River and the sixth year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Determine spring emigration timing of chinook salmon and steelhead smolts collected at the Imnaha River trap. (2) Evaluate effects of flow, temperature and other environmental factors on emigration timing. (3) Monitor the daily catch and biological characteristics of juvenile chinook salmon and steelhead smolts collected at the Imnaha River screw trap. (4) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery chinook salmon smolts released at the Imnaha River acclimation facility to the Imnaha River Trap. (5) Determine arrival timing, travel time and estimated survival of PIT tagged hatchery and natural chinook salmon and natural and hatchery steelhead smolts from the Imnaha River to Snake and Columbia river dams.

  2. Spring Emigration of Natural and Hatchery Chinook Salmon and Steelhead Trout Smolts from the Imnaha River, Oregon; 1997 Annual Report.

    For the fourth consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A screw trap was used to collect emigrating natural and hatchery chinook salmon (Uncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 25 to June 27, 1997. A total of 270 natural chinook salmon, 10,616 hatchery chinook salmon, 864 natural steelhead trout (and 13 natural steelhead parr), and 7,345 hatchery steelhead trout smolts were captured during emigration studies on the Imnaha River. Mortality associated with trapping, handling and tagging was low: 0.37% for natural chinook, 0.11% for hatchery chinook, 0.11% for natural steelhead, and 0.39% for hatchery steelhead trout smolts. Natural chinook salmon smolts emigrated from the Imnaha River from February 25 to June 10 and had a mean length of 108 mm, average weight of 13 g, and mean condition factor of 1.02. The peak period of natural chinook smolt emigration, based on number of fish collected, occurred between March 25 and April 30. Hatchery reared chinook salmon smolts were collected from April 9 to May 9, with 99% of the smolts being caught within 10 days after release. Hatchery chinook smolts mean length, weight, and condition factor were 131 mm, 25.4 g, and 1.12, respectively. Emigration of natural steelhead smolts in the Imnaha River occurred between March 14 and June 25. Peak emigration occurred from May 1 to May 15. Natural steelhead smolts averaged 175 mm in fork length, 55.8 g in weight and had a mean condition factor of 1 .OO. Hatchery steelhead smolts emigrated from the Imnaha River between April 15 and June 27. Hatchery steelhead smolts averaged 210 mm in fork length, 88 g in weight and had a mean condition factor of 0.93. Spring runoff water conditions in 1997 provided above average flows for emigrating anadromous salmonid smolts. Imnaha River mean daily discharge during spring emigration ranged from 7.4 cms (260 cfs) on March 9 to 96.6 cms (3,410 cfs) on April 20 at USGS gauge 13292000, Imnaha, OR. Snake River discharge measured at the Anatone gauge station, ranged from 61.1 to 152 kcfs from April 15 to May 18. River discharge at LGR ranged from 79.6 kcfs on March 6 to 225.3 kcfs on May 18. Flows at LGR were generally greater than 100 kcfs during most of the spring runoff period, and discharge exceeded 120 kcfs from March 20-31 and April 19 to June 24. The water spill period at LGR occurred continuously from April 10 to June 29 with peak spill of 101.9 kcfs occurring on May 17.

  3. Spring Outmigration of Wild and Hatchery Chinook Salmon and Steelhead Trout Smolts from the Imnaha River, Oregon; 1996 Annual Report.

    For the third consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 23 to June 24, 1996. A total of 1,797 wild chinook salmon, 11,896 hatchery chinook salmon, 3,786 wild steelhead trout, and 31,094 hatchery steelhead trout smolts were captured during outmigration studies on the Imnaha River in 1996. Mortality associated with trapping, handling and tagging was low, being 1.4% for wild chinook, 0.18% for hatchery chinook, 0.21% for wild steelhead and 0.28% for hatchery steelhead trout smolts.

  4. Spring Outmigration of Wild and Hatchery Chinook Salmonid Steelhead Trout Smolts from the Imnaha River, Oregon; 1995 Annual Report.

    For the second consecutive year, the Nez Perce Tribe, in conjunction with the Fish Passage Center, participated in the smolt monitoring program in the Imnaha River. A rotary screw trap was used to collect emigrating wild and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead trout (Oncorhynchus mykiss) smolts from February 6 to June 20, 1995. We PIT tagged and released 421 wild chinook salmon smolts, 747 hatchery chinook salmon smolts (445 HxW and 302 HxH), 227 wild steelhead trout smolts and 1,296 hatchery steelhead trout smolts. Cumulative interrogation rates at mainstem Snake and Columbia River dams were 78.4% for wild chinook salmon, 58.9% for hatchery chinook salmon (HxW), 56.6% for hatchery chinook salmon (HxH), 76.2% for wild steelhead trout, and 69.2% for hatchery steelhead trout. Peak outmigration of NPT tagged wild Imnaha River chinook salmon smolts occurred from early to mid-May at Lower Granite, Little Goose, and Lower Monumental Dams. Median and 90% passage dates for wild chinook salmon smolts at Lower Granite Dam were May 1 and May 11, respectively. Continuous spill at Lower Granite Dam was initiated on May 3 and lasted for 51 days. The 90% passage date of wild chinook salmon smolts at Lower Granite Dam (May 11) preceded peak Snake River and Lower Granite (June 6) flows by 26 days. Although hatchery chinook salmon exhibited a shorter outmigration period through the Snake River than their wild counterparts, peak arrival for both groups occurred at approximately the same time. Median and 90% passage dates at Lower Granite Dam for other PIT tagged groups were: hatchery chinook salmon (NPT-HxW) - May 2 and May 13; hatchery chinook salmon (FPC-HxH) - May 8 and May 15; wild steelhead trout - May 2 and May 9; and hatchery steelhead trout (NPT and FPC) - May 31 and June 16. Hatchery steelhead trout displayed small peaks in arrival timing at Lower Granite and Little Goose Dams in mid-May to mid-June.


Search for:
All Records
Author / Contributor
"Blenden, Michael L"

Refine by:
Resource Type
Availability
Publication Date
  • 1996: 1 results
  • 1997: 1 results
  • 1998: 1 results
  • 1999: 0 results
  • 2000: 1 results
  • 2001: 0 results
  • 2002: 1 results
1996
2002
Author / Contributor
Research Organization