skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Diagnosing the PEP-II Injection System

Conference ·
OSTI ID:890841

The injection of beam into the PEP-II B-Factory, especially into the High Energy Ring (HER) has some challenges. A high background level in the BaBar detector has for a while inhibited us from trickling charge into the HER similar to the Low Energy Ring (LER). Analyzing the injection system has revealed many issues which could be improved. The injection bump between two kickers was not closed, mainly because the phase advance wasn't exactly 180{sup o} and the two kicker strengths were not balanced. Additionally we found reflections which kick the stored beam after the main kick and cause the average luminosity to drop about 3% for a 10 Hz injection rate. The strength of the overall kick is nearly twice as high as the design, indicating a much bigger effective septum thickness. Compared with single beam the background is worse when the HER beam is colliding with the LER beam. This hints that the beam-beam force and the observed vertical blow-up in the HER pushes the beam and especially the injected beam further out to the edge of the dynamic aperture or beyond.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
890841
Report Number(s):
SLAC-PUB-11168; TRN: US0604836
Resource Relation:
Conference: Presented at the 9th European Particle Accelerator Conference (EPAC 2004), Lucerne, Switzerland, 5-9 Jul 2004
Country of Publication:
United States
Language:
English

Similar Records

Orbit Distortions and Bumps in the PEP-II LER Ring
Technical Report · Tue Aug 13 00:00:00 EDT 2002 · OSTI ID:890841

The Abort Kicker System for the PEP-II Storage Rings at SLAC.
Technical Report · Fri Jun 20 00:00:00 EDT 2003 · OSTI ID:890841

The PEP-II abort kicker system
Conference · Tue Jul 01 00:00:00 EDT 1997 · OSTI ID:890841