skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Technical design aspects of Feasibility Study-II

Conference ·
OSTI ID:787167

Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10{sup 20} neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly.

Research Organization:
Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
Sponsoring Organization:
USDOE Director, Office of Science. Office of High Energy and Nuclear Physics. Division of High Energy Physics (US)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
787167
Report Number(s):
LBNL-48814; R&D Project: Z3MCMA; TRN: US0110438
Resource Relation:
Conference: The 3rd International Workshop on Neutrino Factories based on Muon Storage Rings, NuFACT'01, Tsukuba (JP), 05/24/2001--05/30/2001; Other Information: PBD: 15 Aug 2001
Country of Publication:
United States
Language:
English