Containment barrier at Pride Park, Derby, England
Abstract
The Pride Park site at Derby occupies 96ha of derelict land close to the city centre. Approximately one third of the site was a closed landfill with a further third being an old gas works site. The remainder comprised former heavy engineering works and gravel pit workings. The River Derwent bounds the site on two sides. The objectives of the remediation strategy for the site included minimising off-site disposal of contaminated soils and ensuring that contaminants do not migrate into the adjacent river. The eastern part of the site, including the landfill and gasworks sites, was therefore contained by a 600mm wide bentonite cement vertical cut-off wall, with HDPE membrane, sealed by 1m into the underlying mudstone. The cut-off wall is some 3km long and a maximum 10m deep. The works were complicated by the need to construct the wall around 36 existing underground services. The paper briefly covers the background to the remediation of the site, describes the construction process and discusses design considerations in relation to the durability requirements of the containment barrier in the potentially aggressive environment.
- Authors:
-
- Bachy, Surrey (United Kingdom)
- Bachy, Rueil Malmaison (France)
- Ove Arup & Partners, Birmingham (United Kingdom)
- Publication Date:
- Research Org.:
- US Department of Energy (USDOE), Washington DC (United States)
- OSTI Identifier:
- 576487
- Report Number(s):
- CONF-970208-Proc.
ON: DE98001967; TRN: 98:005137
- Resource Type:
- Conference
- Resource Relation:
- Conference: International containment technology conference and exhibition, St. Petersburg, FL (United States), 9-12 Feb 1997; Other Information: PBD: [1997]; Related Information: Is Part Of International Containment Technology Conference: Proceedings; PB: 1140 p.
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 54 ENVIRONMENTAL SCIENCES; POLLUTION CONTROL; BENTONITE; CONTAINMENT; SOILS; REMEDIAL ACTION; ENVIRONMENTAL TRANSPORT
Citation Formats
Barker, P, Esnault, A, and Braithwaite, P. Containment barrier at Pride Park, Derby, England. United States: N. p., 1997.
Web.
Barker, P, Esnault, A, & Braithwaite, P. Containment barrier at Pride Park, Derby, England. United States.
Barker, P, Esnault, A, and Braithwaite, P. 1997.
"Containment barrier at Pride Park, Derby, England". United States. https://www.osti.gov/servlets/purl/576487.
@article{osti_576487,
title = {Containment barrier at Pride Park, Derby, England},
author = {Barker, P and Esnault, A and Braithwaite, P},
abstractNote = {The Pride Park site at Derby occupies 96ha of derelict land close to the city centre. Approximately one third of the site was a closed landfill with a further third being an old gas works site. The remainder comprised former heavy engineering works and gravel pit workings. The River Derwent bounds the site on two sides. The objectives of the remediation strategy for the site included minimising off-site disposal of contaminated soils and ensuring that contaminants do not migrate into the adjacent river. The eastern part of the site, including the landfill and gasworks sites, was therefore contained by a 600mm wide bentonite cement vertical cut-off wall, with HDPE membrane, sealed by 1m into the underlying mudstone. The cut-off wall is some 3km long and a maximum 10m deep. The works were complicated by the need to construct the wall around 36 existing underground services. The paper briefly covers the background to the remediation of the site, describes the construction process and discusses design considerations in relation to the durability requirements of the containment barrier in the potentially aggressive environment.},
doi = {},
url = {https://www.osti.gov/biblio/576487},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Dec 31 00:00:00 EST 1997},
month = {Wed Dec 31 00:00:00 EST 1997}
}