Leak before break application in French PWR plants under operation
- EDF SEPTEN, Villeurbanne (France)
Practical applications of the leak-before break concept are presently limited in French Pressurized Water Reactors (PWR) compared to Fast Breeder Reactors. Neithertheless, different fracture mechanic demonstrations have been done on different primary, auxiliary and secondary PWR piping systems based on similar requirements that the American NUREG 1061 specifications. The consequences of the success in different demonstrations are still in discussion to be included in the global safety assessment of the plants, such as the consequences on in-service inspections, leak detection systems, support optimization,.... A large research and development program, realized in different co-operative agreements, completes the general approach.
- Research Organization:
- US Nuclear Regulatory Commission (NRC), Washington, DC (United States). Div. of Engineering Technology; Electricite de France (EDF), 69 - Villeurbanne (France); Battelle Memorial Inst., Columbus, OH (United States)
- OSTI ID:
- 489303
- Report Number(s):
- NUREG/CP-0155; CONF-9510432-; ON: TI97004806; TRN: 97:011443
- Resource Relation:
- Conference: Seminar on leak before break in reactor piping and vessels, Lyon (France), 9-11 Oct 1995; Other Information: PBD: Apr 1997; Related Information: Is Part Of Proceedings of the seminar on leak before break in reactor piping and vessels; Faidy, C. [ed.] [Electricite de France, Villeurbanne (France)]; Gilles, P. [ed.] [Framatome, Paris (France)]; PB: 773 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Applicability of leak-before-break criteria
Conservatism on current leak-before-break application