Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex
Conference
·
OSTI ID:1296919
- Fermilab
After a 16 month shutdown to reconfigure the Fermilab Accelerators for high power operations, the Fermilab Accelerator Complex is again providing beams for numerous Physics Experiments. By using the Recycler to slip stack protons while the Main Injector is ramping, the beam power at 120 GeV can reach 700 KW, a factor of 2 increase. The progress towards doubling the Fermilab's Accelerator complex beam power will be presented.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1296919
- Report Number(s):
- FERMILAB-CONF-14-187-AD; 1314160
- Resource Relation:
- Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
- Country of Publication:
- United States
- Language:
- English
Similar Records
A new slip stacking RF system for a twofold power upgrade of Fermilab's Accelerator Complex
Simulations of the Fermilab Recycler for Losses and Collimation
Fermilab Recycler Collimation System Design
Journal Article
·
Thu May 15 00:00:00 EDT 2014
· Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment
·
OSTI ID:1296919
Simulations of the Fermilab Recycler for Losses and Collimation
Conference
·
Mon Jun 01 00:00:00 EDT 2015
·
OSTI ID:1296919
+1 more
Fermilab Recycler Collimation System Design
Conference
·
Tue Oct 04 00:00:00 EDT 2016
·
OSTI ID:1296919
+10 more