skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Rebuild of Capture Cavity 1 at Fermilab

Abstract

The front end of the proposed Advanced Superconducting Test Accelerator at Fermilab employs two single cavity cryomodules, known as 'Capture Cavity 1' and 'Capture Cavity 2', for the first stage of acceleration. Capture Cavity 1 was previously used as the accelerating structure for the A0 Photoinjector to a peak energy of ~14 MeV. In its new location a gradient of ~25 MV/m is required. This has necessitated a major rebuild of the cryomodule including replacement of the cavity with a higher gradient one. Retrofitting the cavity and making upgrades to the module required significant redesign. The design choices and their rationale, summary of the rebuild, and early test results are presented.

Authors:
 [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1]
  1. Fermilab
Publication Date:
Research Org.:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Org.:
USDOE Office of Science (SC), High Energy Physics (HEP)
OSTI Identifier:
1296794
Report Number(s):
FERMILAB-CONF-14-203-AD-TD
1312121
DOE Contract Number:  
AC02-07CH11359
Resource Type:
Conference
Resource Relation:
Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS

Citation Formats

Harms, E., Arkan, T., Borissov, E., Dhanaraj, N., Hocker, A., Orlov, Y., Peterson, T., and Premo, K. Rebuild of Capture Cavity 1 at Fermilab. United States: N. p., 2014. Web.
Harms, E., Arkan, T., Borissov, E., Dhanaraj, N., Hocker, A., Orlov, Y., Peterson, T., & Premo, K. Rebuild of Capture Cavity 1 at Fermilab. United States.
Harms, E., Arkan, T., Borissov, E., Dhanaraj, N., Hocker, A., Orlov, Y., Peterson, T., and Premo, K. 2014. "Rebuild of Capture Cavity 1 at Fermilab". United States. https://www.osti.gov/servlets/purl/1296794.
@article{osti_1296794,
title = {Rebuild of Capture Cavity 1 at Fermilab},
author = {Harms, E. and Arkan, T. and Borissov, E. and Dhanaraj, N. and Hocker, A. and Orlov, Y. and Peterson, T. and Premo, K.},
abstractNote = {The front end of the proposed Advanced Superconducting Test Accelerator at Fermilab employs two single cavity cryomodules, known as 'Capture Cavity 1' and 'Capture Cavity 2', for the first stage of acceleration. Capture Cavity 1 was previously used as the accelerating structure for the A0 Photoinjector to a peak energy of ~14 MeV. In its new location a gradient of ~25 MV/m is required. This has necessitated a major rebuild of the cryomodule including replacement of the cavity with a higher gradient one. Retrofitting the cavity and making upgrades to the module required significant redesign. The design choices and their rationale, summary of the rebuild, and early test results are presented.},
doi = {},
url = {https://www.osti.gov/biblio/1296794}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jan 01 00:00:00 EST 2014},
month = {Wed Jan 01 00:00:00 EST 2014}
}

Conference:
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that hold this conference proceeding.

Save / Share: