Determine Operating Reactor to Use for the 2016 PCI Level 1 Milestone
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
The Consortium for Advanced Simulation of Light Water Reactors (LWRs) (CASL) Level 1 milestone to “Assess the analysis capability for core-wide [pressurized water reactor] PWR Pellet- Clad Interaction (PCI) screening and demonstrate detailed 3-D analysis on selected sub-region” (L1:CASL.P13.03) requires a particular type of nuclear power plant for the assessment. This report documents the operating reactor and cycles chosen for this assessment in completion of the physics integration (PHI) milestone to “Determine Operating Reactor to use for PCI L1 Milestone” (L3:PHI.CMD.P12.02). Watts Bar Unit 1 experienced (at least) one fuel rod failure in each of cycles 6 and 7, and at least one was deemed to be duty related rather than being primarily related to a manufacturing defect or grid effects. This brief report documents that the data required to model cycles 1–12 of Watts Bar Unit 1 using VERA-CS contains sufficient data to model the PHI portion of the PCI challenge problem. A list of additional data needs is also provided that will be important for verification and validation of the BISON results.
- Research Organization:
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Consortium for Advanced Simulation of LWRs (CASL)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 1238027
- Report Number(s):
- ORNL/SPR-2016/38; NT0304000; NEAF343; CASL-U-2016-1035-000; TRN: US1600532
- Country of Publication:
- United States
- Language:
- English
Similar Records
Standalone BISON Fuel Performance Results for Watts Bar Unit 1, Cycles 1-3
Assessing pellet-clad interaction with VERA: WBN1, cycles 6-7