Hardware-in-the-Loop Testing of Utility-Scale Wind Turbine Generators
- Clemson Univ., SC (United States)
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
Historically, wind turbine prototypes were tested in the field, which was--and continues to be--a slow and expensive process. As a result, wind turbine dynamometer facilities were developed to provide a more cost-effective alternative to field testing. New turbine designs were tested and the design models were validated using dynamometers to drive the turbines in a controlled environment. Over the years, both wind turbine dynamometer testing and computer technology have matured and improved, and the two are now being joined to provide hardware-in-the-loop (HIL) testing. This type of testing uses a computer to simulate the items that are missing from a dynamometer test, such as grid stiffness, voltage, frequency, rotor, and hub. Furthermore, wind input and changing electric grid conditions can now be simulated in real time. This recent advance has greatly increased the utility of dynamometer testing for the development of wind turbine systems.
- Research Organization:
- National Renewable Energy Lab. (NREL), Golden, CO (United States)
- Sponsoring Organization:
- USDOE Office of Energy Efficiency and Renewable Energy (EERE), Wind and Water Technologies Office (EE-4W)
- DOE Contract Number:
- AC36-08GO28308
- OSTI ID:
- 1237305
- Report Number(s):
- NREL/TP-5000-64787
- Country of Publication:
- United States
- Language:
- English
Similar Records
Real-Time Digital Simulation of Inertial Response with Hardware-in-the-Loop Implementation on the CART3 Wind Turbine at the National Wind Technology Center
The WEI6K, a 6-kW 7-m Small Wind Turbine: Final Technical Report