Final Technical Report
- Northwestern University
This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.
- Research Organization:
- Northwestern Univ., Evanston, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- Contributing Organization:
- Northwestern University
- DOE Contract Number:
- FG02-05ER41397
- OSTI ID:
- 1098050
- Report Number(s):
- DOE-NORTHWESTERN-41397; CNV0041710; 60012623
- Country of Publication:
- United States
- Language:
- English
Similar Records
Long bunch trains measured using a prototype cavity beam position monitor for the Compact Linear Collider
First Full Beam Loading Operation with the CTF3 Linac