skip to main content

Title: Chemical decontamination technical resources at Los Alamos National Laboratory (2008)

This document supplies information resources for a person seeking to create planning or pre-planning documents for chemical decontamination operations. A building decontamination plan can be separated into four different sections: Pre-planning, Characterization, Decontamination (Initial response and also complete cleanup), and Clearance. Of the identified Los Alamos resources, they can be matched with these four sections: Pre-planning -- Dave Seidel, EO-EPP, Emergency Planning and Preparedness; David DeCroix and Bruce Letellier, D-3, Computational fluids modeling of structures; Murray E. Moore, RP-2, Aerosol sampling and ventilation engineering. Characterization (this can include development projects) -- Beth Perry, IAT-3, Nuclear Counterterrorism Response (SNIPER database); Fernando Garzon, MPA-11, Sensors and Electrochemical Devices (development); George Havrilla, C-CDE, Chemical Diagnostics and Engineering; Kristen McCabe, B-7, Biosecurity and Public Health. Decontamination -- Adam Stively, EO-ER, Emergency Response; Dina Matz, IHS-IP, Industrial hygiene; Don Hickmott, EES-6, Chemical cleanup. Clearance (validation) -- Larry Ticknor, CCS-6, Statistical Sciences.
Authors:
 [1]
  1. Los Alamos National Laboratory
Publication Date:
OSTI Identifier:
960882
Report Number(s):
LA-UR-08-06344; LA-UR-08-6344
TRN: US201008%%791
DOE Contract Number:
AC52-06NA25396
Resource Type:
Conference
Resource Relation:
Conference: Submittal to David Janecky, LANL ENV-EAQ ; October 10, 2008 ; Los Alamos
Research Org:
Los Alamos National Laboratory (LANL)
Sponsoring Org:
DOE
Country of Publication:
United States
Language:
English
Subject:
45; AEROSOLS; BUILDINGS; CLEARANCE; DECONTAMINATION; ENGINEERING; EQUIPMENT; FLUIDS; INFORMATION; LANL; PLANNING; PUBLIC HEALTH; RESOURCES; SAMPLING; SIMULATION; VALIDATION; VENTILATION