ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities
The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupational Radiation Protection. The basic requirements for the performance of ALARA design reviews are presented in the Hanford Site Radiological Control Manual (HSRCM). The HSRCM has established trigger levels requiring radiological reviews of non-routine or complex work activities. These requirements are implemented in site procedures HNF-PRO-1622 and 1623. HNF-PRO-1622 Radiological Design Review Process requires that ''radiological design reviews [be performed] of new facilities and equipment and modifications of existing facilities and equipment''. In addition, HNF-PRO-1623 Radiological Work Planning Process requires a formal ALARA Review for planned activities that are estimated to exceed 1 person-rem total Dose Equivalent (DE). The purpose of this review is to validate that the original design for the PFP Cementation Process ensures that the principles of ALARA (As Low As Reasonably Achievable) were included in the original project design. That is, that the design and operation of existing Cementation Process equipment and processes allows for the minimization of personnel exposure in its operation, maintenance and decommissioning and that the generation of radioactive waste is kept to a minimum.
- Research Organization:
- Fluor Hanford, Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM) (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 803934
- Report Number(s):
- HNF-6175, Rev.0; EDT-627551; TRN: US0300770
- Resource Relation:
- Other Information: PBD: 14 Jun 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
Technical Basis for Work Place Air Monitoring for the Plutonium Finishing Plan (PFP)
Criticality Safety Controls and the Safety Basis at PFP