Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid
Abstract
Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).
- Authors:
- Publication Date:
- Research Org.:
- CH2M Hill Hanford Group, Inc., Richland, WA (United States)
- Sponsoring Org.:
- ENVIRONMENTAL MANAGEMENT (US)
- OSTI Identifier:
- 801327
- Report Number(s):
- HNF-5820, Rev.0
EDT-618010; TRN: US0300363
- DOE Contract Number:
- AC06-96RL13200
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: PBD: 28 Feb 2000
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; PUMPS; MEASURING INSTRUMENTS; MONITORS; PUMPING; STORAGE FACILITIES; PERFORMANCE TESTING; COMPUTERIZED CONTROL SYSTEMS; WASTE RETRIEVAL
Citation Formats
KOCH, M R. Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid. United States: N. p., 2000.
Web. doi:10.2172/801327.
KOCH, M R. Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid. United States. https://doi.org/10.2172/801327
KOCH, M R. 2000.
"Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid". United States. https://doi.org/10.2172/801327. https://www.osti.gov/servlets/purl/801327.
@article{osti_801327,
title = {Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid},
author = {KOCH, M R},
abstractNote = {Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).},
doi = {10.2172/801327},
url = {https://www.osti.gov/biblio/801327},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Feb 28 00:00:00 EST 2000},
month = {Mon Feb 28 00:00:00 EST 2000}
}
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.