Technical design aspects of Feasibility Study-II
Conference
·
OSTI ID:787167
Feasibility Study-II examined a high-performance Neutrino Factory providing 1 x 10{sup 20} neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration ration (MC) and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R and D activities are also described briefly.
- Research Organization:
- Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
- Sponsoring Organization:
- USDOE Director, Office of Science. Office of High Energy and Nuclear Physics. Division of High Energy Physics (US)
- DOE Contract Number:
- AC03-76SF00098
- OSTI ID:
- 787167
- Report Number(s):
- LBNL-48814; R&D Project: Z3MCMA; TRN: US0110438
- Resource Relation:
- Conference: The 3rd International Workshop on Neutrino Factories based on Muon Storage Rings, NuFACT'01, Tsukuba (JP), 05/24/2001--05/30/2001; Other Information: PBD: 15 Aug 2001
- Country of Publication:
- United States
- Language:
- English
Similar Records
Report of the Snowmass M6 working group on high intensity proton sources
Technical implementation of feasibility study-II design
Interim Design Report for the International Design Study for a Neutrino Factory
Conference
·
Wed Aug 01 00:00:00 EDT 2001
· eConf
·
OSTI ID:787167
Technical implementation of feasibility study-II design
Conference
·
Thu Mar 22 00:00:00 EST 2001
·
OSTI ID:787167
Interim Design Report for the International Design Study for a Neutrino Factory
Technical Report
·
Sat Oct 01 00:00:00 EDT 2011
·
OSTI ID:787167
+8 more