Title: Engineering task plan for the development of a high pressure water drill system for BY-105 saltwell screen installation

Technical Report ·
DOI:https://doi.org/10.2172/781545· OSTI ID:781545

This engineering task plan identifies the activities required for developing an ultra high pressure water drill system for installation of a saltwell screen in Tank BY-105. A water drill system is needed to bore through the hard waste material in this tank because of the addition of Portland cement in the 1960s and/or 1970s. The activities identified in this plan include the design, procurement, and qualification testing of the water drill along with readiness preparations including developing operating procedures, training Operations personnel, and conducting an assessment of readiness.

Research Organization:
Hanford Site (HNF), Richland, WA (United States)
Sponsoring Organization:
US DOE Office of Environmental Management (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
781545
Report Number(s):
HNF-3225-REV0; EW3120071; EW3120071; TRN: US0111167
Resource Relation:
Other Information: PBD: 24 Feb 1999
Country of Publication:
United States
Language:
English