skip to main content

Title: HIGH POWER OPERATIONS AT THE LOW ENERGY DEMONSTRATION ACCELERATOR (LEDA)

Recently, the Low-Energy Demonstration Accelerator (LEDA) portion of the Accelerator Production of Tritium (APT) project reached its 100-mA, 8-hr continuous wave (CW) beam operation milestone. The LEDA accelerator is a prototype of the low-energy front-end of the linear accelerator (linac) that would have been used in an APT plant. LEDA consists of a 75-keV proton injector, 6.7-MeV, 350-MHz CW radio-frequency quadrupole (RFQ) with associated high-power and low-level RF systems, a short high-energy beam transport (HEBT) and high-power (670-kW CW) beam dump. Details of the LEDA design features will be discussed along with the operational health physics experiences that occurred during the LEDA commissioning phase.
Authors:
;
Publication Date:
OSTI Identifier:
773885
Report Number(s):
LA-UR-01-552
TRN: US0102610
DOE Contract Number:
W-7405-ENG-36
Resource Type:
Conference
Resource Relation:
Conference: Conference title not supplied, Conference location not supplied, Conference dates not supplied; Other Information: PBD: 1 Jan 2001
Research Org:
Los Alamos National Lab., NM (US)
Sponsoring Org:
US Department of Energy (US)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; BEAM DUMPS; BEAM TRANSPORT; LINEAR ACCELERATORS; TRITIUM; PRODUCTION; PROTON BEAMS; QUADRUPOLES; RADIATION PROTECTION; RF SYSTEMS; BEAM INJECTION; DESIGN; OPERATION