Title: Value engineering study final report on -- Spallation Neutron Source, Oak Ridge, Tennessee

The SNS Project has had numerous DOE/SC reviews to validate the technical baseline, management approach, cost, schedule, and Conceptual Design Report. As a result, in FY 1999 the SNS received $130 million and approval from Congress to initiate Title 1 design and construction activities. Since this funding was less than requested for FY 1999 ($157 million) and validated in previous reviews, and because of improved costing information, the SNS Project team will reassess the cost and schedule baselines in an upcoming DOE review in January 1999. In preparation for this reassessment, the SNS has initiated a value engineering process to improve the design and to recover cost and contingency. Value engineering will continue throughout the life of the project, but the results described in this report are our initial efforts.
Publication Date:
OSTI Identifier:
764588
Report Number(s):
DOE/OR/22686-1--Vol.1
TRN: US0303030
DOE Contract Number:
AI05-98OR22686
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 31 Jan 1999
Sponsoring Org:
Oak Ridge National Laboratory, Oak Ridge, TN (US)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; CONSTRUCTION; DESIGN; MANAGEMENT; NEUTRON SOURCES; SCHEDULES; SPALLATION; TENNESSEE SPALLATION NEUTRON SOURCE; VALUE ENGINEERING STUDY