skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Bottom/Side Lift Gantry Conceptual Design Rev. 01

Technical Report ·
DOI:https://doi.org/10.2172/762937· OSTI ID:762937

The purpose of this task is to update the existing bottom/side lift gantry analysis so that the design is consistent with Enhanced Design Alternative II (EDA II) design constraints listed in the Monitored Geologic Repository Project Description Document (CRWMS M and O 1999a, Section 2.2.1.1, p. 9a). This update is consistent with the requirements of the Technical Guidance Document for License Application Preparation (YMP 1999, Section 6.2.5.1). This update will also take into account the latest available equipment classification and Waste Emplacement/Retrieval System Description Document (SDD) (CRWMS M and O 2000c) requirements. The principal objective of this analysis is to verify that the newly developed bottom/side lift gantry concept continues to be a suitable design concept for the current Monitored Geologic Repository (MGR) design. This analysis includes an examination of the waste package (WP) transfer operation at the emplacement drift transfer dock. In addition, this analysis verifies that the gantry is compatible with the WP transporter, which has been redesigned to handle WPs sitting on pallets (CRWMS M and O 2000a). The scope of this work is to examine the existing analysis and to determine what, if any, modifications to the analysis may be required as a result of additional requirements imposed by the EDA II concept. Then, a revision will be made to the conceptual design accordingly. The analysis will also be revised to show the approximate sizes and locations of the electrical equipment and control cabinets, and to take into account the weight of that equipment in the total gantry weight. The analytical portions of the analysis are revised, as required, to address changes resulting from modifications to the conceptual design or from changes in classification and/or SDD requirements. Finally, the revised conceptual design is evaluated to verify that it continues to be a suitable method for handling the WPs within the emplacement drift. Except as noted, the scope of this work does not include any new analytical investigations or any detailed studies regarding the mechanical or electrical subsystems of the gantry beyond those in Revision 00 of this analysis. This analysis has been prepared in accordance with the requirements set forth in Bottom/Side Lift Gantry Analysis (CRWMS M and O 1999b). This analysis supports the MGR design that will be presented as part of the Site Recommendation.

Research Organization:
Yucca Mountain Project, Las Vegas, NV (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC08-91RW00134
OSTI ID:
762937
Report Number(s):
ANL-WES-ME-000003 REV 01; MOL.20000420.0399, DC No. 24315; TRN: US0402777
Resource Relation:
Other Information: PBD: 11 Apr 2000; PBD: 11 Apr 2000
Country of Publication:
United States
Language:
English

Similar Records

RIP Input From WAPDEG for LA Desgin Selection: Enhanced Design Alternative II
Technical Report · Fri Jul 16 00:00:00 EDT 1999 · OSTI ID:762937

Subsurface Contamination Control
Technical Report · Wed Dec 12 00:00:00 EST 2001 · OSTI ID:762937

Subsurface Contamination Control
Technical Report · Fri Nov 16 00:00:00 EST 2001 · OSTI ID:762937