Title: Installation of the central production facilities deck for the Mokoko-Abana Field, Cameroon

Journal Article · · SPE (Society of Petroleum Engineers) Product. Eng.; (United States)
DOI:https://doi.org/10.2118/14082-PA· OSTI ID:7121373

To reduce development costs at the Mokoko-Abana field, all production equipment was installed in deck units during fabrication and the equipment was precommissioned in the contractors' yards before loadout. The 5,000-ton (4500-Mg) central production facilities deck, however, exceeded lifting capabilities of available marine equipment, so a unique installation technique was developed that uses tidal changes and rapid barge ballasting to lower the completed deck onto a specially designed jacket.

Research Organization:
Pecten Intl. Co. (US)
OSTI ID:
7121373
Journal Information:
SPE (Society of Petroleum Engineers) Product. Eng.; (United States), Vol. 3:2
Country of Publication:
United States
Language:
English