skip to main content

Title: Feasibility study for retrofitting/repowering of Unit 2, Station A at Kosovo, (EPK) Yugoslavia: Scope of work and detailed cost estimate. Export trade information

The primary objective of the feasibility study is to examine the life extension of the existing Unit 2 at Station A of the Electric Power Company of Kosovo (EPK). The study will consider state-of-the-art fluidized bed combustion boiler technology along with revitalization and retrofitting of the existing boiler with conventonal environmental controls for reduction of sulfur and particulate emissions. in addition, the study will include the examination of the rest of the power plant equipment for refurbishment and/or replacement.
Publication Date:
OSTI Identifier:
7022861
Report Number(s):
PB-92-216720/XAB
Resource Type:
Technical Report
Resource Relation:
Other Information: This document was provided to NTIS by the U.S. Trade and Development Program, Rosslyn, VA. See also PB92-216712
Country of Publication:
United States
Language:
English
Subject:
20 FOSSIL-FUELED POWER PLANTS; 29 ENERGY PLANNING, POLICY AND ECONOMY; FOSSIL-FUEL POWER PLANTS; RETROFITTING; YUGOSLAVIA; AIR POLLUTION CONTROL; COST ESTIMATION; EQUIPMENT; EXPORTS; FEASIBILITY STUDIES; FLUIDIZED BED BOILERS; FLUIDIZED-BED COMBUSTORS; FLY ASH; POLLUTION CONTROL EQUIPMENT; SERVICE SECTOR; SULFUR DIOXIDE; TRADE; AEROSOL WASTES; ASHES; BOILERS; CHALCOGENIDES; COMBUSTION PRODUCTS; COMBUSTORS; CONTROL; DEVELOPING COUNTRIES; EUROPE; OXIDES; OXYGEN COMPOUNDS; POLLUTION CONTROL; POWER PLANTS; RESIDUES; SULFUR COMPOUNDS; SULFUR OXIDES; THERMAL POWER PLANTS; WASTES 200100* -- Fossil-Fueled Power Plants-- Power Plants & Power Generation; 296000 -- Energy Planning & Policy-- Electric Power; 290200 -- Energy Planning & Policy-- Economics & Sociology