Standard operating procedure: Gas atmosphere MELCO brazing furnace
Abstract
A hydrogen and argon gas atmosphere furnace facility using electric furnaces is located at the Clinton P. Anderson Meson Physics Facility (LAMPF). This furnace system was acquired to handle smaller jobs with a more rapid response time than was possible with the larger furnaces. Accelerator- and experimental-related components best assembled by atmosphere brazing techniques are routinely processed by this facility in addition to special heat treatment and bakeout heats. The detailed operation sequence and description of the MELCO furnace system are covered by this report. This document is to augment LA-10231-SOP, which describes the operation of the large furnace systems. 6 figs.
- Authors:
- Publication Date:
- Research Org.:
- Los Alamos National Lab., NM (USA)
- OSTI Identifier:
- 6976670
- Report Number(s):
- LA-11353-SOP
ON: DE88014014
- DOE Contract Number:
- W-7405-ENG-36
- Resource Type:
- Technical Report
- Resource Relation:
- Other Information: Portions of this document are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 42 ENGINEERING; ELECTRIC FURNACES; OPERATION; ARGON; CONTROLLED ATMOSPHERES; HYDROGEN; STANDARDIZATION; ATMOSPHERES; ELEMENTS; FLUIDS; FURNACES; GASES; NONMETALS; RARE GASES; 421000* - Engineering- Combustion Systems
Citation Formats
Waller, C R. Standard operating procedure: Gas atmosphere MELCO brazing furnace. United States: N. p., 1988.
Web.
Waller, C R. Standard operating procedure: Gas atmosphere MELCO brazing furnace. United States.
Waller, C R. 1988.
"Standard operating procedure: Gas atmosphere MELCO brazing furnace". United States.
@article{osti_6976670,
title = {Standard operating procedure: Gas atmosphere MELCO brazing furnace},
author = {Waller, C R},
abstractNote = {A hydrogen and argon gas atmosphere furnace facility using electric furnaces is located at the Clinton P. Anderson Meson Physics Facility (LAMPF). This furnace system was acquired to handle smaller jobs with a more rapid response time than was possible with the larger furnaces. Accelerator- and experimental-related components best assembled by atmosphere brazing techniques are routinely processed by this facility in addition to special heat treatment and bakeout heats. The detailed operation sequence and description of the MELCO furnace system are covered by this report. This document is to augment LA-10231-SOP, which describes the operation of the large furnace systems. 6 figs.},
doi = {},
url = {https://www.osti.gov/biblio/6976670},
journal = {},
number = ,
volume = ,
place = {United States},
year = {Mon Aug 01 00:00:00 EDT 1988},
month = {Mon Aug 01 00:00:00 EDT 1988}
}
Other availability
Please see Document Availability for additional information on obtaining the full-text document. Library patrons may search WorldCat to identify libraries that may hold this item. Keep in mind that many technical reports are not cataloged in WorldCat.
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.