Peach bottom recirculation piping replacement ALARA program
Conference
·
· Trans. Am. Nucl. Soc.; (United States)
OSTI ID:6885451
In late 1983, Philadelphia Electric Company (PECo) began detailed planning to replace the recirculation, residual heat removal, and part of the reactor water cleanup piping of the Peach Bottom Unit 2 reactor. Included in this work was an estimate of the collective exposure expected during piping replacement. That initial estimate, 1945 man-rem, is compared with the actual collective dose incurred during the piping replacement program. Also included are the exposures incurred during two additional tasks (safe end replacement and recirculation pump disassembly and decontamination) not considered in the initial estimate.
- Research Organization:
- General Electric Co., King of Prussia, PA
- OSTI ID:
- 6885451
- Report Number(s):
- CONF-860610-; TRN: 87-016213
- Journal Information:
- Trans. Am. Nucl. Soc.; (United States), Vol. 52; Conference: American Nuclear Society annual meeting, Reno, NV, USA, 15 Jun 1986
- Country of Publication:
- United States
- Language:
- English
Similar Records
ALARA review for peach bottom unit 3 pipe replacement modification
Increasing ALARA awareness at Peach Bottom Atomic Power Station; The Unit 3 pipe replacement project
Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement
Conference
·
Fri Jan 01 00:00:00 EST 1988
· Trans. Am. Nucl. Soc.; (United States)
·
OSTI ID:6885451
Increasing ALARA awareness at Peach Bottom Atomic Power Station; The Unit 3 pipe replacement project
Journal Article
·
· Radiation Protection Management; (United States)
·
OSTI ID:6885451
Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement
Technical Report
·
Wed Mar 01 00:00:00 EST 1995
·
OSTI ID:6885451
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
PEACH BOTTOM-1 REACTOR
REACTOR MAINTENANCE
PEACH BOTTOM-2 REACTOR
PEACH BOTTOM-3 REACTOR
RADIATION PROTECTION
ALARA
DECONTAMINATION
PIPES
PRIMARY COOLANT CIRCUITS
PUMPS
RADIATION DOSES
REMOVAL
RHR SYSTEMS
TRAINING
VALVES
WELDED JOINTS
BWR TYPE REACTORS
CLEANING
CONTROL EQUIPMENT
COOLING SYSTEMS
DOSES
ENERGY SYSTEMS
ENRICHED URANIUM REACTORS
EQUIPMENT
FLOW REGULATORS
GAS COOLED REACTORS
GRAPHITE MODERATED REACTORS
HELIUM COOLED REACTORS
HTGR TYPE REACTORS
JOINTS
MAINTENANCE
POWER REACTORS
REACTOR COMPONENTS
REACTOR COOLING SYSTEMS
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100* - Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
PEACH BOTTOM-1 REACTOR
REACTOR MAINTENANCE
PEACH BOTTOM-2 REACTOR
PEACH BOTTOM-3 REACTOR
RADIATION PROTECTION
ALARA
DECONTAMINATION
PIPES
PRIMARY COOLANT CIRCUITS
PUMPS
RADIATION DOSES
REMOVAL
RHR SYSTEMS
TRAINING
VALVES
WELDED JOINTS
BWR TYPE REACTORS
CLEANING
CONTROL EQUIPMENT
COOLING SYSTEMS
DOSES
ENERGY SYSTEMS
ENRICHED URANIUM REACTORS
EQUIPMENT
FLOW REGULATORS
GAS COOLED REACTORS
GRAPHITE MODERATED REACTORS
HELIUM COOLED REACTORS
HTGR TYPE REACTORS
JOINTS
MAINTENANCE
POWER REACTORS
REACTOR COMPONENTS
REACTOR COOLING SYSTEMS
REACTORS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100* - Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled