Title: Reservoir analysis study: Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 3 report, Recommended additional reservoir engineering analysis

Technical Report ·
OSTI ID:6851508

The basis for completion of the Phase III tasks above were the reports of Phases I and II and the associated backup material. The Phase II report was reviewed to identify the major uncertainties in all of the reserve assignments. In addition to the Proved, Probable and Possible reserves of Phase II, ''potential reserves'' or those associated with a greater degree of risk than the Possible reserves included in the Phase II report, were also identified based on the work performed by Bergeson through the Phase II reporting date. Thirty-three specific studies were identified to address the major Phase II reserve uncertainties or these potential reserves. These studies are listed in Table 1 and are grouped by the Elk Hills pool designation. The basis and need for each study are elaborated in the discussion which follows. Where possible, the need for the study was quantified by associating the study with a particular reserve estimate which would be clarified by the analysis. This reserve value was either the Probable or Possible reserves which were being studied, the potential reserves that were identified, or simply the uncertainty inherent in the proved reserves as identified in the study purpose. The costs associated with performing the study are also shown in Table 1 and were estimated based on Bergeson's knowledge of the Elk Hills reservoirs and data base following Phases I and II, as well as the company's experience in performing similar studies in other fields. The cost estimates are considered reasonable for general budgeting purposes, but may require refinement prior to actual initiation of these studies. This is particularly true for studies involving field testing to obtain additional log, core or test information as the cost of such items is not considered in this report. 51 figs., 46 tabs.

Research Organization:
Bergeson (Jerry R.) and Associates, Inc., Golden, CO (USA)
DOE Contract Number:
AC01-88FE61445
OSTI ID:
6851508
Report Number(s):
DOE/FE/61445-T2; ON: DE88015794
Resource Relation:
Other Information: Paper copy only, copy does not permit microfiche production