Title: Investigation of the Geokinetics horizontal in-situ oil-shale-retorting process. Quarterly report, April, May, June 1982

Technical Report ·
OSTI ID:6727794

The Retort No. 25 burn was terminated on June 15, 1982. Total oil production for the second quarter was 6506 barrels during a 76 day production period. Final oil production for Retort No. 25 was 20,956 barrels. Final oil recovery was calculated to be 59% of the total in-place oil. Fugitive emissions, stack and process gas data indicated that all Retort No. 25 pollutants, except NO/sub x/, were below the allowable PSD limits. The Retort No. 25 process water characterization study was completed in April to determine the changes in retort produced water as the retort burn progressed. Results of the study are pending the completion of laboratory analysis. Retort No. 26 was prepared for ignition during the second quarter. Process manifolding and instrumentation were being completed so that ignition might occur shortly after the termination of the Retort No. 25 burn. Post blast core drilling and analysis was completed on Retort No. 27 during early April. The core samples indicated improved fracturing over previous retorts, especially near the bottom. Increasing the size of Retort No. 27 from one acre to two acres showed an increase in blast efficiency based on the criteria of fragmentation, quantity of explosives used per volume of void induced and percent void when compared with Retort No. 24. In June initial site preparation began on Retort No. 28 for blast hole drilling which will start in July. 17 figures, 16 tables.

Research Organization:
Geokinetics, Inc., Salt Lake City, UT (USA)
DOE Contract Number:
FC20-78LC10787
OSTI ID:
6727794
Report Number(s):
DOE/LC/10787-100; ON: DE83001810
Resource Relation:
Other Information: Portions of document are illegible
Country of Publication:
United States
Language:
English