skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Penstock productivity improved

Journal Article · · Independent Energy; (USA)
OSTI ID:6681511

The Strawberry Water Users Association recently realized a significant increase in output on their hydroelectric plant near Spanish Fork, Utah. The plant's output was declining steadily and the problem was determined to be caused by build-up in its 11,000 foot long, 18 inch diameter penstock. After considering replacing the penstock or using hydro-blasting, the association decided that the pipe could be cleaned internally with flexible foam pits. Following the cleaning operation, the plant's output increased 22 percent to 345 kW. The new output level represents an increase in the association's annual income from the sale of electricity of $32,850 -enough to cover the costs of the equipment and contractor costs in approximately one year. The association plans to maintain maximum production by pumping an 18 inch pig down the line each year.

OSTI ID:
6681511
Journal Information:
Independent Energy; (USA), Vol. 19:7; ISSN 1043-7320
Country of Publication:
United States
Language:
English

Similar Records

Report on siphon penstocks for hydroelectric projects
Technical Report · Wed Feb 01 00:00:00 EST 1989 · OSTI ID:6681511

Brigham City Hydro Generation Project
Technical Report · Sat Oct 31 00:00:00 EDT 2015 · OSTI ID:6681511

Dealing with a penstock rupture: A success story
Journal Article · Sun Aug 01 00:00:00 EDT 1993 · Hydro Review; (United States) · OSTI ID:6681511