Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 2. Unit RL-10 boiler condition assessment report. Export trade information
Technical Report
·
OSTI ID:6618172
The study, conducted by Babcock and Wilcox, was funded by the U.S. Trade and Development agency on behalf of Enelven. In order to maximize generated power output and minimize operating costs at Planta Ramon Laguna, tests were done to evaluate the condition of equipment at the plant. In order to identify any damage and determine the operating output of each unit, assessments were done of the furnaces, boilers, generators and boiler feed pumps being used in the plant. The report presents the results of these tests. This is the second of three volumes and it includes the following section: (1) Condition Assessment of Unit RL-10 Boiler.
- Research Organization:
- Babcock and Wilcox Co., Barberton, OH (United States)
- OSTI ID:
- 6618172
- Report Number(s):
- PB-95-170122/XAB
- Resource Relation:
- Other Information: This document was provided to NTIS by the U.S. Trade and Development Agency, Rosslyn, VA. See also Volume 1, PB--95-170114 and Volume 3, PB--95-170130
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 3. Unit RL-10 turbine generator condition assessment report and units RL-10 and RL-11 boiler feed pump conditon assessment report. Export trade information
Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 1. Executive summary, RL-17 test report, and gas conversion proposals. Export trade information
Feasibility study of units 3 and 4. Batlle y Ordonez Power Station and expansion of La Tablada Power Station. Export trade information
Technical Report
·
Thu Mar 28 00:00:00 EST 1991
·
OSTI ID:6618172
Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 1. Executive summary, RL-17 test report, and gas conversion proposals. Export trade information
Technical Report
·
Thu Mar 28 00:00:00 EST 1991
·
OSTI ID:6618172
Feasibility study of units 3 and 4. Batlle y Ordonez Power Station and expansion of La Tablada Power Station. Export trade information
Technical Report
·
Fri Jan 21 00:00:00 EST 1994
·
OSTI ID:6618172
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
03 NATURAL GAS
NATURAL GAS
FUEL SUBSTITUTION
RETROFITTING
FEASIBILITY STUDIES
THERMAL POWER PLANTS
ECONOMIC ANALYSIS
TECHNOLOGY ASSESSMENT
ECONOMICS
ENERGY SOURCES
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
POWER PLANTS
200600* - Fossil-Fueled Power Plants- Economic
Industrial
& Business Aspects- (1990-)
030600 - Natural Gas- Economic
Industrial
& Business Aspects
03 NATURAL GAS
NATURAL GAS
FUEL SUBSTITUTION
RETROFITTING
FEASIBILITY STUDIES
THERMAL POWER PLANTS
ECONOMIC ANALYSIS
TECHNOLOGY ASSESSMENT
ECONOMICS
ENERGY SOURCES
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
POWER PLANTS
200600* - Fossil-Fueled Power Plants- Economic
Industrial
& Business Aspects- (1990-)
030600 - Natural Gas- Economic
Industrial
& Business Aspects