skip to main content

Title: Results of High Velocity Tests at Tampa Electric Company`s Big Bend 4 FGD System.

Test were conducted at the Big Bend Station to determine the feasibility of scrubbing gas from an additional boiler in the existing FGD system. Testing was accomplished by increasing the gas flow from the D absorber tower and measuring the performance of this module. Key performance aspects evaluated during the testing include mist eliminator performance, SO2 removal efficiency, oxidation of absorbed SO2, and limestone utilization.
Authors:
Publication Date:
OSTI Identifier:
644644
Report Number(s):
DOE/PC/91338--T27
ON: DE98051806
DOE Contract Number:
AC22-92PC91338
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 15 Oct 1997
Research Org:
Radian International, LLC, Austin, TX (United States)
Sponsoring Org:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
Country of Publication:
United States
Language:
English
Subject:
01 COAL, LIGNITE, AND PEAT; 20 FOSSIL-FUELED POWER PLANTS; DESULFURIZATION; EFFICIENCY; FLUE GAS; LIMESTONE; PERFORMANCE