Gas line construction in frigid Canadian winter
Journal Article
·
· Pipe Line Ind.; (United States)
OSTI ID:6289835
Construction of a 128-mile, 42-in. gas transmission line through Precambrian rock formations in the Canadian shield proved difficult for contractors on TransCanada Pipeline's expansion program. Multiple construction problems included severe cold weather (-40/sup 0/F), a right-of-way sited midway between two live natural gas lines, and a system installed in eight different loops stretching almost 500 miles from one and to the other.
- OSTI ID:
- 6289835
- Journal Information:
- Pipe Line Ind.; (United States), Vol. 58
- Country of Publication:
- United States
- Language:
- English
Similar Records
Winter construction practices used on TransCanada loops
TCPL 42-in. loop installation a difficult victory over weather
Gregory and Cook installing Mojave's gas transmission line
Journal Article
·
Tue Aug 01 00:00:00 EDT 1989
· Pipe Line Industry; (USA)
·
OSTI ID:6289835
TCPL 42-in. loop installation a difficult victory over weather
Journal Article
·
Fri Oct 01 00:00:00 EDT 1982
· Pipeline Gas J.; (United States)
·
OSTI ID:6289835
Gregory and Cook installing Mojave's gas transmission line
Journal Article
·
Tue Oct 01 00:00:00 EDT 1991
· Pipe Line Industry; (United States)
·
OSTI ID:6289835