skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Retrofit costs for lime/limestone FGD and lime spray drying at coal-fired utility boilers

Technical Report ·
OSTI ID:6181031

The paper gives results of a research program the objective of which was to significantly improve engineering cost estimates currently being used to evaluate the economic effects of applying SO2 controls to existing coal-fired utility boilers. The costs of retrofitting conventional lime/limestone wet flue gas desulfurization (L/LS FGD) and lime spray drying (LSD) FGD at 100-200 coal-fired power plants are being estimated under this program. The retrofit capital cost estimating procedures used for L/LS FGD and LSD FGD make two cost adjustments to current procedures used to estimate FGD costs: cost adders (for items not normally included in FGD system costs; e.g., demolition and relocation of existing facilities) and cost multipliers (to adjust capital costs for site access, congestion, and underground obstructions).

Research Organization:
Radian Corp., Research Triangle Park, NC (USA)
OSTI ID:
6181031
Report Number(s):
PB-91-136952/XAB; CNN: EPA-68-02-3994
Country of Publication:
United States
Language:
English