skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Fessenheim 1, 1989; The first 10-year outage of a French 900 MW reactor

Conference · · Proceedings of the American Power Conference; (United States)
OSTI ID:6018321
; ;  [1];  [2]
  1. Electricite de France-CLI, Villeuranne (FR)
  2. Electricite de France-REAL, Fessenheim (FR)

10 years after the preservice inspection in 1979, French legislation required the Fessenheim 1 900 MW reactor unit to undergo specific inspections necessitating a long-duration shut-down. EDF, the French Electricity Board, decided to take advantage of the shut-down to make major improvements to safety, fire detection and fire-fighting systems. Fessenheim 1 was shut down on April 7th 1989 and reconnected to the grid on October 14th in the same year. The overall operation was brought to a successful conclusion. This paper reviews the objectives and preparatives for the operation, describes the key phases and summarizes the main benefits.

OSTI ID:
6018321
Report Number(s):
CONF-9004133-; CODEN: PAPWA
Journal Information:
Proceedings of the American Power Conference; (United States), Vol. 52; Conference: 52. American power conference, Chicago, IL (United States), 23-25 Apr 1990; ISSN 0097-2126
Country of Publication:
United States
Language:
English