Energy engineering analysis program, Anniston Army Depot, Increment B, final report; executive summary. Final report
In July 1985, the Army Corps of Engineers, Mobile District, modified their existing contract to include the performance of an additional energy study. The contractual Scope of Work calls for an Energy Engineering Analysis Program (EEAP) study to be conducted at Anniston Army Depot (AAD). This report covers the Energy Monitoring and Control System (EMCS) portion of Increment B of the EEAP study. The Scope of Work calls for the systematic evaluation of the cost effectiveness of an EMCS that will result in the reduction of the installation`s energy use. The general Scope of Work for the EMCS portion of Increment B can be summarized as follows: (1) Review and make effective use of existing energy studies in preparing the EMCS project; (2) Field trips should be used to obtain information on facilities to develop the requirements necessary for the EMCS; (3) Determine the feasibility of an EMCS for building electrical, mechanical, and utility distribution systems; (4) Prepare Project Development Brochures (PDBs), DD Form 1391`s, and supporting documentation for the proposed EMCS project if it meets ECIP criteria; and (5) Detailed recommendations are to be generated and a final report will be provided.
- Research Organization:
- Science Applications International Corp., Huntsville, AL (United States)
- OSTI ID:
- 557379
- Report Number(s):
- AD-A-330269/2/XAB; SAIC-87/5002/HU; TRN: 73441147
- Resource Relation:
- Other Information: PBD: Jan 1988
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy Engineering Analysis. Cutler Army Community Hospital and Associated Facilities, Fort Devens, Massachusetts. Volume 1 - executive summary. Final Submittal report
Energy engineering analysis program, Anniston Army Depot. Final report