Estimating gas kick arrival to better manage surface flow
- Parker Drilling Co. Training Center, Odessa, TX (United States)
There are many quality, expertly designed programs for teaching rig crews prevention and control of well kicks. Much time and money has been spent training rig crews for procedures and methods to avoid kicks, and what to do if you have one, even though all accepted practices were followed. One false/bad result from this training is that individuals have come away from this training believing that once a gas kick is circulated through the choke, all problems are simple and manageable, i.e., the danger has passed. What you do with gas once it is downstream of the choke has not been given enough emphasis in some training programs, including the one the author is involved in. This article, prepared from experiences on actual rig locations in Wyoming and Argentina, and developed for well control training in Parker Drilling Co.`s Training Center, Odessa, Texas, describes a method for estimating the time, in pump strokes and/or minutes, for a gas kick to reach surface. Reducing pump strokes (circulating flowrate) and knowing available time to gas kick arrival allows the crew to prepare surface handling equipment. Common misconceptions about gas handling and potential resulting problems are noted. An example calculation describes the calculation procedure.
- OSTI ID:
- 509419
- Journal Information:
- World Oil, Vol. 218, Issue 6; Other Information: PBD: Jun 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
New Accessory for Cleaning the Inside of the Machine Tool Cavity
Condensate kicks pose additional problems for deep well control