Combined cycle comes to the Philippines
Abstract
The first combined cycle power station in the Philippines has gone into operation at National Power Corporation`s (NPC) Limay Bataan site, some 40 km west of Manila. The plant comprises two 300 MW blocks in 3+3+1 configuration, based on ABB Type GT11N gas turbines. It was built by a consortium of ABB, with their Japanese licensee Kawasaki Heavy Industries, and Marubeni Corporation. This paper discusses Philippine power production, design and operation of the Limay Bataan plant, and conversion of an existing turbine of the nuclear plant project that was abandoned earlier, into a combined cycle operation. 6 figs.
- Publication Date:
- OSTI Identifier:
- 50491
- Resource Type:
- Journal Article
- Journal Name:
- Turbomachinery International
- Additional Journal Information:
- Journal Volume: 36; Journal Issue: 2; Other Information: PBD: Mar-Apr 1995
- Country of Publication:
- United States
- Language:
- English
- Subject:
- 20 FOSSIL-FUELED POWER PLANTS; 33 ADVANCED PROPULSION SYSTEMS; 29 ENERGY PLANNING AND POLICY; PHILIPPINES; POWER DEMAND; ENERGY POLICY; COMBINED-CYCLE POWER PLANTS; DESIGN; STEAM TURBINES; MODIFICATIONS; GAS TURBINE POWER PLANTS
Citation Formats
. Combined cycle comes to the Philippines. United States: N. p., 1995.
Web.
. Combined cycle comes to the Philippines. United States.
. 1995.
"Combined cycle comes to the Philippines". United States.
@article{osti_50491,
title = {Combined cycle comes to the Philippines},
author = {},
abstractNote = {The first combined cycle power station in the Philippines has gone into operation at National Power Corporation`s (NPC) Limay Bataan site, some 40 km west of Manila. The plant comprises two 300 MW blocks in 3+3+1 configuration, based on ABB Type GT11N gas turbines. It was built by a consortium of ABB, with their Japanese licensee Kawasaki Heavy Industries, and Marubeni Corporation. This paper discusses Philippine power production, design and operation of the Limay Bataan plant, and conversion of an existing turbine of the nuclear plant project that was abandoned earlier, into a combined cycle operation. 6 figs.},
doi = {},
url = {https://www.osti.gov/biblio/50491},
journal = {Turbomachinery International},
number = 2,
volume = 36,
place = {United States},
year = {Wed Mar 01 00:00:00 EST 1995},
month = {Wed Mar 01 00:00:00 EST 1995}
}
Other availability
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.